Premade Cabinets for a Fast Rental Turn

On a rental turn the cabinet order sets the move-in date. CasaBuilt publishes assembled orders at within two weeks and RTA orders at 3-10 business days, against the 8-12 weeks it attributes to the traditional route — a difference of more than a month on the same kitchen. For a unit sitting empty, that month is the whole project.

Create an image of a box focus with a red tamper tape seal
A rental turn rewards a plan built from stock widths and a delivery date booked before the old cabinets come out.

Key takeaways

  • RTA orders ship in 3-10 business days; assembled orders are quoted at within two weeks.
  • The traditional lead time CasaBuilt cites is 8-12 weeks, or roughly 56 to 84 days.
  • Base cabinets come in twelve widths from 9 to 42 inches, all 34-1/2 inches high and 24 inches deep.
  • Free shipping starts at $2,500, which matters when a single unit needs a full kitchen.

The clock starts at the order, not at the delivery

A turn is a sequence of dependencies, and the cabinets sit near the front of it. Nothing can be templated until the base cabinets are set. Nothing can be painted behind a wall cabinet that is already hung. Nothing can be floored under a cabinet that is already fixed. Every day the cabinet order slips moves the whole chain, which is why the order date matters more than the installation date.

The practical consequence is that the measurement has to happen before the unit is empty. A property manager who waits until the last tenant leaves to measure the kitchen has already spent part of the window doing nothing. Measure with the old cabinets still in place, note the appliance widths, and order against those numbers. The published cabinet depths and heights are standard, so a measured plan transfers to a new kitchen without a second site visit.

Storage is the other half of the timing decision. RTA cabinets arrive flat-packed, which means they can sit in a closet or a corner of the unit until the installer is free. Assembled cabinets arrive closed and take up the floor space they will eventually occupy. On a turn with no spare room, the flat-pack format is often the difference between ordering now and ordering after the painting is done.

The published windows, in days

CasaBuilt publishes 3-10 business days for RTA cabinets, within two weeks for assembled cabinets, and three business days or less for the trade quick-ship commitment. The company also cites 8-12 weeks as the traditional showroom lead time. Alaska and Hawaii sit outside the standard RTA window, which is worth checking before a remote property is scheduled.

Published ship windows, read 22 Oct 2026. The industry figure is CasaBuilt's own comparison, shown at the low end of its 8-12 week range.
RoutePublished windowBusiness daysWhat it means on a turn
RTA, fastest3 days3Order after the unit is measured, before it is empty
RTA, slowest10 days10Still inside a two-week painting and flooring phase
Pre-assembled2 weeks14Removes the build step but adds days at the front
Trade quick ship3 days or less3Program benefit for eligible trade orders
Industry comparison8 weeks56The baseline CasaBuilt argues against

Read the table as a schedule rather than a scorecard. The 14-day assembled window and the 10-day RTA window overlap with work that has to happen anyway: demolition, patching, paint, flooring. A turn planned around those tasks absorbs most of a cabinet lead time without adding a single day to the calendar.

Stock widths that keep a turn on schedule

A rental kitchen rarely needs a complicated plan. It needs a sink base, a run of base cabinets, a run of wall cabinets and a tall cabinet or a refrigerator surround. The published base widths are 9, 12, 15, 18, 21, 24, 27, 30, 33, 36, 39 and 42 inches, every one 34-1/2 inches high and 24 inches deep. Wall cabinets are 12 inches deep in 30, 36 and 42-inch heights, from 9 to 39 inches wide.

That grid lets a turn be planned from the wall length backwards. A 30-inch base and a 36-inch base cover 66 inches; add a 15-inch base and the run is 81 inches, all from stock. The point is not to fill the wall exactly but to reach the ends with a filler or a panel rather than a custom cabinet, because a custom width is the one thing that cannot be ordered on a two-week schedule.

CasaBuilt lists premade cabinets across 28 items in four construction groups, so the style choice is real but bounded. For a rental, the practical filter is a painted Shaker door in a mid-tone, which hides wear better than a flat white and photographs well in a listing. The published bundle prices start at $1,184.93 in Hudson Grey and $1,199.50 in White Shaker for six cabinets, which is a realistic starting point for a studio or a small one-bedroom.

Where a turn goes wrong is appliance fit. A 30-inch range needs 30 inches of clearance plus the cabinet run on either side, and a refrigerator box is not a wall cabinet. Write the appliance model numbers into the plan before the cabinet order goes out, then check the door swing against the nearest base cabinet. A cabinet that has to be reordered costs more than the days it saved.

What to have ready before the order

Four things: wall lengths at counter height and at cabinet height, ceiling height, appliance widths and the position of every outlet and water line. Photograph each wall with a tape measure in the frame; the photographs resolve arguments later. CasaBuilt's free 3D design service turns those inputs into a plan in 24-48 hours, which is fast enough to overlap with the painting phase on a small unit.

Then decide the format deliberately. RTA means assembly on site, with hardware and step-by-step guides in the box, and it is the shortest route from order to install. Assembled means the cabinets arrive closed, which suits a turn where the labor is a single installer working alone and every hour on site is billed. Neither changes the installation work: leveling, fixing to the wall and scribing to the room happen either way.

The trade program is worth a look for anyone doing more than one unit. It publishes 15-25% preferred pricing against standard retail, a quick-ship commitment of three business days or less, and quoting assistance. The details sit on the trade partner page, and the pricing matters because it applies to a whole building rather than a single kitchen.

Worked example: the calendar, in days

The chart lists five figures: RTA low 3 business days, RTA high 10, pre-assembled 14, trade quick ship 3, and the industry low 56. Take the comparison the company makes first. Subtract 14 from 56 and the assembled route saves 42 days, or six weeks. Subtract 10 from 56 and the RTA route saves 46 days. Divide 56 by 14 and the traditional route takes four times as long as the assembled one.

Now look inside the range rather than at its endpoints. The RTA spread is 10 minus 3, or 7 days, and that spread is the uncertainty a scheduler has to absorb. A turn planned on the fast end with no buffer is a turn that slips by a week if the order lands at the slow end. Planning on 10 days and receiving in 3 buys a week of slack that can go into paint or flooring.

Put the saving against a turn's fixed costs in time rather than money. A 42-day saving at the assembled window is six weeks in which the unit either earns rent or does not. Two turns a year planned this way compound to 12 weeks — most of a quarter — and the arithmetic needs no assumption about rent to be useful. It is simply calendar time recovered.

Published ship windows, in business days
Published ship windows, in business days. Values: RTA low 3 days; RTA high 10 days; Pre-assembled 14 days; Trade quick ship 3 days; Industry low 56 days. Source: CasaBuilt's published figures at casabuiltcabinets.com, read 22 Oct 2026.

Frequently asked questions

Can I order cabinets before the old ones are removed?

Yes, and on a turn you usually should. Measure the existing kitchen while it is still in place, note appliance widths and ceiling height, and order against those numbers. The published base and wall dimensions are standard, so the plan does not depend on the room being empty.

Which format is faster for a rental turn?

RTA is the shorter published window at 3-10 business days, against within two weeks for assembled cabinets. RTA arrives flat-packed, which also stores more easily in a unit with no spare room. The assembled line removes the build step, so it can still be the faster option if the installer's hourly rate is the constraint.

What is the trade quick-ship commitment?

Three business days or less, offered through the trade program rather than as the standard window. It sits alongside 15-25% preferred pricing and quoting assistance. A landlord or manager running several units should ask about eligibility before scheduling a turn around it.

Schedule the order, then the trades

Measure with the old kitchen still standing, order on the shortest published window the project can absorb, and book the installer for a date after the slow end of that window rather than the fast end. Keep a filler allowance in the plan so the last few inches do not become a custom order. The turn finishes on time because the cabinet date was set before the demolition date.

Figures quoted here come from the manufacturer's own website, read 22 Oct 2026[1.